What I did yesterday: Upsell addon new logic. slack, regular fe support
what i will do today: subscription details be, Slack,
Asif
What I did yesterday: invoice tax bug fix and enhancements, time track
what i will do today: time track 3 forms with api integration,
Ridwan
What I did yesterday: - timetrack (timesheet 100%), worklog
what i will do today: timetrack (timesheet 100%), worklog
Blocker:
Rabab:
What i did yesterday: setup fee quantity (release), manual email template (release), timetrack checklist,file feedback v2, release note
what i will do today: ,file feedback v2, invoice created date edit, notes limit increase,client email editable, 2bugs
Nafi:
What i did yesterday: file feedbaack v2, slack list of missing features
what i will do today: file feedbaack v2, slack list of missing features
Jewel:
What i did yesterday: client email editable, 2bugs
what i will do today:
Abhijeet
What i did yesterday: filter sort new behavior, 2 bugs
what i will do today: mention avatar, subscription details.
Tasfi:
What i did yesterday:
new sprint walkthough
vat tax update
website task assistance
empty states
client profile update link and fields etc
What i will do today:
service v2 responsive
upper nav
component update
price breakdown, limit
service suffling
Ali:
what i did yesterday:
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
google drive/workspace PRD
Task division for new sprint
new task for PM.
check clients queries
25-4-25
Atik:
What I did yesterday: Upsell addon new logic, filefeedback v2,
what i will do today: Upsell addon new logic. slack, regular fe support
Asif
What I did yesterday: invoice vat tax new journey, timetrack, setup fee,
what i will do today: invoice tax bug fix and enhancements, time titrack
Ridwan
What I did yesterday: - timetrack (timesheet 90%)
what i will do today: timetrack (timesheet 100%), worklog
Blocker: manyual email template icon from
@Tasfiah Tabassum
Rabab:
What i did yesterday: vat tax test, set up fee, filter, file feedback v2, template, all task
what i will do today: setup fee quantity (release), manual email template (release), timetrack checklist,file feedback v2, release note
Nafi:
What i did yesterday: File feedback v2 (100%), proposal calculation fix
what i will do today: file feedbaack v2, slack list of missing features
Jewel:
What i did yesterday: note limit increase, created date in invoice input (test), toaster redesign
what i will do today: client email editable, 2bugs
Abhijeet
What i did yesterday: filter sort new behavior (filter new implemented requires review)
what i will do today: filter sort new behavior, 2 bugs
Tasfi:
What i did yesterday:
new sprint walkthough
vat tax update
website task assistance
empty states
client profile update link and fields etc
What i will do today:
timetrack
service upper nav,
image for website
Ali:
what i did yesterday:
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
23-4-25
Atik:
What I did yesterday: one time and subscription merge, additional prod issues, template manual bank.
what i will do today: Upsell addon new logic.slack,
Asif
What I did yesterday: set up fee, vat tax issue,lead client same same email, time track
what i will do today: invoice vat tax new journey, timetrack, setup fee,
Ridwan
What I did yesterday: - vat tax bug fixes, preference, bug fixes
what i will do today: timetrack
Rabab:
What i did yesterday: vat tax test, set up fee, filter, file feedback v2, template , preference
what i will do today: vat tax test, set up fee, filter, file feedback v2, template, all task
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: file feedback v2, setup fee
Jewel:
What i did yesterday: filter sort new behavior (order)
what i will do today: note limit increase, created make input wise
Abhijeet
What i did yesterday: filter sort new behavior
what i will do today: filter sort new behavior
Tasfi:
What i did yesterday:
new sprint walkthough
vat tax update
website task assistance
empty states
client profile update link and fields etc
What i will do today:
timetrack
service upper nav,
image for website
Ali:
what i did yesterday:
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
22-4-25
Atik:
What I did yesterday: one time and subscription
what i will do today: one time and subscription merge, additional prod issues, template manual bank.
Asif
What I did yesterday: set up fee, vat tax issue,lead client same same email, time track
what i will do today: set up fee, vat tax issue,lead client same same email, time track
Ridwan
What I did yesterday: - vat tax, all task
what i will do today: vat tax bug fixes, preference, bug fixes
Rabab:
What i did yesterday: template, filter sorf, vat tax, client profile update
what i will do today: vat tax test, set up fee, filter, file feedback v2, template , preference
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: file feedback v2, language bug
Jewel:
What i did yesterday: iframe single service URL, client profile update
what i will do today: filter sort new behavior (order)
Abhijeet
What i did yesterday: Issue fix while running. if fixed work on iframe
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
21-4-25
Atik:
What I did yesterday: vat delete and bug fixes
what i will do today: vat delete and bug fixes, template, prod issue, create,
Asif
What I did yesterday: vat tax test ready.
what i will do today: set up fee, vat tax issue,lead client same same email, time track
Ridwan
What I did yesterday: - vat tax, Invoice and purchase flow of vat tax
what i will do today: vat tax bug fixes, preference
Rabab:
What i did yesterday: Vat tax API update, create testing and create form test
what i will do today: vat tax test, set up fee, filter sort state save file feedback v2, template , preference
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: file feedback v2
Jewel:
What i did yesterday: iframe single service url
what i will do today: filter sort new behavior
Abhijeet
What i did yesterday: Issue fix while running. if fixed work on iframe
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
18-4-25
Atik:
What I did yesterday: vat delete and bug fixes
what i will do today: vat delete and bug fixes, template, prod issue, create,
Asif
What I did yesterday: vat tax test ready.
what i will do today: vat tax bug fixes, lead client bug fixes.
Ridwan
What I did yesterday: - vat tax, Invoice and purchase flow of vat tax
what i will do today: vat tax bug fixes, preference
Rabab:
What i did yesterday: Vat tax API update, create testing and create form test
what i will do today: vat tax subscription complex.
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: vat tax test
Jewel:
What i did yesterday: iframe single service url
what i will do today: create invoice date field
Abhijeet
What i did yesterday: Issue fix while running. if fixed work on iframe
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
17-4-25
Atik:
What I did yesterday: vat delete and bug fixes
what i will do today: vat delete and bug fixes
Asif
What I did yesterday: vat tax test ready.
what i will do today: vat tax bug fixes and other bug fixes
Ridwan
What I did yesterday: - vat tax, Invoice and purchase flow of vat tax
what i will do today: vat tax bug fixes, filter and new tasks.
Rabab:
What i did yesterday: Vat tax API update, create testing and create form test
what i will do today: vat tax backend test and full cycle if ready
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: vat tax backend test
Jewel:
What i did yesterday: Issue fix while running. if fixed work on iframe
what i will do today: iframe single service url
Abhijeet
What i did yesterday: Issue fix while running. if fixed work on iframe
what i will do today: iframe single service url
Tasfi:
What i did yesterday:
new sprint walkthough
vat tax update
website task assistance
empty states
client profile update link and fields etc
What i will do today:
time track, invoice logic , mobile responsive, icon pack
Ali:
what i did yesterday:
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
16-4-25
Atik:
What I did yesterday: vat delete
what i will do today: vat delete and bug fixes
Asif
What I did yesterday: vat tax test ready.
what i will do today: vat tax bug fixes and other bug fixes
Ridwan
What I did yesterday: - vat tax, Invoice and purchase flow of vat tax
what i will do today: vat tax
Rabab:
What i did yesterday: Vat tax API update, create testing and create form test
what i will do today: vat tax backend test and full cycle if ready
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: vat tax backend test
Jewel:
What i did yesterday: Issue fix while running. if fixed work on iframe
what i will do today: Issue fix while running. if fixed work on iframe to be done by today.
Tasfi:
What i did yesterday:
new sprint walkthough
vat tax update
website task assistance
empty states
client profile update link and fields etc
What i will do today:
time track, invoice logic , mobile responsive, icon pack
Ali:
what i did yesterday:
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
15-4-25
Atik:
What I did yesterday: vat tax stripe subscription
what i will do today: vat
Asif
What I did yesterday: purchase confirm form
what i will do today: vat tax test ready.
Ridwan
What I did yesterday:- ivat tax, Invoice and purchase flow of vat tax
what i will do today: invoice and issues
Rabab:
What i did yesterday: Vat tax API update, create testing and create form test
what i will do today: vat tax backend test and full cycle if ready
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: vat tax backend test
Jewel:
What i did yesterday: Issue fix while running. if fixed work on iframe
what i will do today: Issue fix while running. if fixed work on iframe
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
11-4-25
Atik:
What I did yesterday: vat tax
what i will do today: vat tax stripe subscription
Asif
What I did yesterday: completing edit api integration and starting purchase part
what i will do today: purchase confirm form
Ridwan
What I did yesterday:- ivat tax, Invoice and purchase flow of vat tax
what i will do today: invoice details, invoice settings and issue fix
Rabab:
What i did yesterday: Vat tax API update, create testing and create form test
what i will do today: vat tax api testing, enhancement testing.
Nafi:
What i did yesterday: File feedback v2 (100%)
what i will do today: slack test
Jewel:
What i did yesterday: client field add for phone number and iframe for single service issue fixes and social link add for client profile
what i will do today: Issue fix while running. if fixed work on iframe
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
10-4-25
Atik:
What I did yesterday: vat tax
what i will do today: vat tax
Asif
What I did yesterday: completed vat tax create edit ui and create api integration
what i will do today: completing edit api integration and starting purchase part
Ridwan
What I did yesterday:- integrated api for tax activation, deactivation from tax table
- Integrated api for tax details
- integrated api for service with tax, for both create and edit
what i will do today: vat tax, Invoice and purchase flow of vat tax
Rabab:
What i did yesterday: vat tax crud API testing
what i will do today: Vat tax API update,create testing and create form test
Nafi:
What i did yesterday: File feedback v2 (40%)
what i will do today: File feedback v2 try to finish feature testing
Jewel:
What i did yesterday: client field add for phone number and iframe for single service
what i will do today: client field add for phone number and iframe for single service issue fixes and social link add for cient profile
Tasfi:
What i did yesterday:
new sprint walkthough
vat tax update
website task assistance
empty states
client profile update link and fields etc
What i will do today:
sprint task planning and deliverables
Ali:
what i did yesterday:
1. Proposal prd 1st draft feedback and additional research
2. Datadog metrics go through
3. Vat/tax PRD and logic update
4. roadmap prioritization sequence (70%) will recheck and show the updated version tomorrow
5. roadmap request status change
What I will do today:
Roadmap queries
roadmap update
feature roadmap timeline estimation
Proposal
Service prd update
9-4-25
Atik:
What I did yesterday: vat tax
what i will do today: vat tax
Asif
What I did yesterday: vat tax create edit form 90% ui
what i will do today: vat tax create api integration and edit api start
Ridwan
What I did yesterday:Invoice and purchase flow of vat tax
what i will do today: vat tax invoice flow start
Rabab:
What i did yesterday: vat tax crud API testing
what i will do today: Vat tax API update,create testing and create form test
Nafi:
What i did yesterday: File feedback v2 (40%)
what i will do today: File feedback v2 try to finish feature testing
Jewel:
What i did yesterday: client field add for phone number and iframe for single service
what i will do today: client field add for phone number and iframe for single service issue fixes and social link add for cient profile
8-4-25
Atik:
what i will do today: vat tax (from 20% to 40%)
Asif
What I did yesterday:
what i will do today: vat tax, production/release bugs
Ridwan
what i will do today: vat tax, production/release bugs
Rabab:
what i will do today: lead and client will be same email, template
Nafi:
what i will do today: production.
7-4-25
Atik:
what i will do today: vat tax (from 20% to 40%)
Asif
what i will do today: vat tax, production/release bugs
Ridwan
what i will do today: vat tax, production/release bugs
Rabab:
what i will do today: lead and client will be same email, template
SSR support (expected initial demo tomorrow) (pushed off because of code review and dev queries)
code review
Blockers/ Assistance
Atik
Yesterday:
slack
production bug fix
Today:
slack bug fix if needed
vat tax prd review if possible
production bug fix
Tasfi
What did I do yesterday:
VAT TAX
What do I do today:
Vat Tax
Date: 17.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Retested 5 packages & Integration Test of 5 packages
Checklist of Embedded Support
What do I do today:
User issues
dev done issue testing
embedded checklist finish
Nafi
Yesterday:
Production Bug
Conducted Stand Up
Discussed about Role permission with PM
Automation R&D for payment flow- continue
Today:
automation RnD for payment flow
Slack (in office)
Ridwan
Yesterday:
Embedded App Support
Today:
Embedded App Support (card view and details view API)
Blockers/ Assistance
Asif
Yesterday:
Embedded App Support (UI 80%, create API )
Today:
Embedded App Support (sidebar, UI 100%, sidebar redirection view)
Blockers/ Assistance
Ali
yesterday
Handover vat tax to UX
Any updates on vat tax if needed
Roadmap update
Role permission update
Weekly matrix
Today
Roadmap
Stand up
meeting with ux regarding vat/tax
this week deliverables list
new sprint ready follow up
user queries check
new released feature check
RElease note post
new feature user guide review
Tohid
Yesterday:
On Leave
Today:
SSR support (expected initial demo tomorrow)
code review
Blockers/ Assistance
Atik
Yesterday:
Embedded Support
Prod Bug - manager role
Today:
slack
production bug fix
Tasfi
What did I do yesterday:
VAT TAX
Redirection (85%) (on hold for vat/tax)
What do I do today:
Vat Tax
Date: 14.03.2025 not updated
Location: Office
Opening
Rabab
What did I do yesterday:
Tested workspace language in release server
Feature test & Integration test of 100% coupon
% package Test
Posted 1 bug about service API while conducting API testing
What do I do today:
Retested 5 packages & Integration Test of 5 packages
Checklist of Embedded Support
Nafi
Yesterday:
Production Test
Automation
Automation R&D for payment flow (10%)
Today:
Production Bug
Conducted Stand Up
Discussed about Role permission with PM
Automation R&D for payment flow- continue
Ridwan
Yesterday:
Kuwaiti currency support
Today:
Embedded App Support
Blockers/ Assistance
Asif
Yesterday:
fixed 1 issue of 100% coupon
Turkish Language
Fixed some placeholder text
Today:
Embedded App Support
Blockers/ Assistance
Ali
yesterday
VAT TAX PRD
Dev queries
New Sprint start
Roadmap update
Today
Handover vat tax to UX
Any updates on vat tax if needed
Roadmap update
Role permission update
Weekly matrix
Tohid
Yesterday:
On Leave
Today:
On Leave
Blockers/ Assistance
Atik
Yesterday:
Embedded Support - continue
Today:
Embedded Support
Prod Bug - manager role
Tasfi
What did I do yesterday:
Logo Fix
What do I do today:
VAT TAX
Redirection
Date: 13.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Tested workspace language in release server
Feature test & Integration test of 100% coupon
% package Test
Posted 1 bug about service API while conducting API testing
What do I do today:
Retested 5 packages & Integration Test of 5 packages
Checklist of Embedded Support
Nafi
Yesterday:
Production Test
Automation
Automation R&D for payment flow (10%)
Today:
Production Bug
Conducted Stand Up
Discussed about Role permission with PM
Automation R&D for payment flow- continue
Ridwan
Yesterday:
Kuwaiti currency support
Today:
Embedded App Support
Blockers/ Assistance
Asif
Yesterday:
fixed 1 issue of 100% coupon
Turkish Language
Fixed some placeholder text
Today:
Embedded App Support
Blockers/ Assistance
Ali
yesterday
VAT TAX PRD
Dev queries
New Sprint start
Roadmap update
Today
Handover vat tax to UX
Any updates on vat tax if needed
Roadmap update
Role permission update
Weekly matrix
Tohid
Yesterday:
On Leave
Today:
On Leave
Blockers/ Assistance
Atik
Yesterday:
Embedded Support - continue
Today:
Embedded Support
Prod Bug - manager role
Tasfi
What did I do yesterday:
Logo Fix
What do I do today:
VAT TAX
Redirection
Date: 12.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Workspace Language continue due to previously raised bugs
Bug fix test from Asif & Atik
Delete Subscription test
What do I do today:
Tested workspace language in release server
Feature test & Integration test of 100% coupon
% package Test
Posted 1 bug about service API while conducting API testing
Nafi
Yesterday:
Workspace Language retest and bug fix test
Prod bugs came from users
Integration Test
Today:
Production Test
Automation
Automation R&D for payment flow
Ridwan
Yesterday:
Workspace Language bug fix
PR feedback Resolve
Today:
Kuwaiti currency support
Blockers/ Assistance
Asif
Yesterday:
Prod issues
100% coupon bug fix (last 1 bug - had BE dependency)
Today:
fixed 1 issue of 100% coupon
Turkish Language
Fixed some placeholder text
Blockers/ Assistance
Ali
yesterday
Next Sprint Finalize 30%
Meeting
VAT TAX R&D 1st Draft
R&D on embedded support screen size
Today
VAT TAX PRD
Dev queries
New Sprint start
Roadmap update
Tohid
Yesterday:
On Leave
Today:
On Leave
Blockers/ Assistance
Atik
Yesterday:
Embedded Support - continue
Today:
Embedded Support-
Tasfi
What did I do yesterday:
Embedded support pitch
Embedded support enhancement
What do I do today:
Logo Fix
Date: 11.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Conducted testing of Workspace Language
Completed testing of 8 bug fixes of production & 4 bug fixes on release
100% Coupon test done
What do I do today:
Workspace Language continue due to previously raised bugs
Bug fix test from Asif & Atik
Nafi
Yesterday:
Tested prod bug and fix
Workspace Language bug fix
Payment confirmation email bug fix
Standup meeting
Today:
Workspace Language retest and bug fix test
Prod bugs came from users
Ridwan
Yesterday:
workspace language latest code review fix
PROD bug fix
5 package support 100%
Today:
Workspace Language bug fix
PR feedback Resolve
Blockers/ Assistance
Asif
Yesterday:
Prod issues
100% coupon bug fix
AH Subscription issue
Today:
Prod issues
100% coupon bug fix (last 1 bug - had BE dependency)
Blockers/ Assistance
Ali
yesterday
Next sprint finalize 70%
Embedded and sandbox design ready
Today
Next Sprint Finalize 30%
Meeting
VAT TAX R&D 1st Draft
R&D on embedded support screen size
Tohid
Yesterday:
On Leave
Today:
On Leave
Blockers/ Assistance
Atik
Yesterday:
Embedded Support
Today:
Embedded Support - continue
Tasfi
What did I do yesterday:
work on Embedded support v1 feedback
Redirect link issue
Rectangle logo issue resolve
Embedded support v2
What do I do today:
Embedded support pitch
Embedded support enhancement
Date: 10.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Rich Text editor test & bug post
Production bug fixes test, and posted 2 bugs on follow up
Intercom issues verify and post
Workspace Language Test 75%
Tested bug fixes of 100% coupon
What do I do today:
Complete testing of Workspace Language
Will Complete testing of 5 bug fixes of production.
Nafi
Yesterday:
Tested prod bug and fix
Today:
Workspace Language
Ridwan
Yesterday:
workspace language latest code review fix
fix invoice prefix issues if any
5 package support
Today:
Prod bug fix
Blockers/ Assistance
Asif
Yesterday:
fixed 4 prod issues
worked on Editor issues
Today:
Prod issues
Blockers/ Assistance
Ali
yesterday
On leave
Today
Next sprint finalize
Embedded and sandbox design ready
Tohid
Yesterday:
complete the prod fixes
vite setup for production, test, release server
Today:
On Leave
Bolckers/ Assistance
Atik
Yesterday:
Client custom access
Prod bug fix (Workspace parent child)
Today:
Embedded Support
Tasfi
What did I do yesterday:
Embed System Enhance with Embed inside of a feature
Redirect URL after Purchasing
Rectangle Logo Size and Resolution
Rectangle Logo in Collapsed Sidebar
What do I do today:
work on Embedded support v1 feedback
Redirect link issue
Rectangle logo issue resolve
Embedded support v2
Date: 07.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Rich Text editor test & bug post
Production bug fixes test, and posted 2 bugs on follow up
Intercom issues verify and post
Workspace Language Test 75%
Tested bug fixes of 100% coupon
What do I do today:
Complete testing of Workspace Language
Will Complete testing of 5 bug fixes of production.
Nafi
Yesterday:
Tested prod bug fix: Non-English Characters Are Not Displayed When Creating a Client or Lead
Posted Prod bug: Non-English Characters Incorrectly Treated as Special Characters in Workspace Name
Posted Prod bug: Unable to Edit or Update Subscription Reminder Email Template Due to Validation Error
Production issues came from users
Verified language working procedure in production
Updated PRD of Subscription
Verified 2 issues of Invoice Prefix and Posted 1 more issues of Invoice Prefix
Today:
Integration Test of Invoice Prefix
Ridwan
Yesterday:
- workspace language code review fixes
- debugging workspace language local storage support not working in test server.
- invoice issue fix
- 5 package support ( not much work could be done because of workspace language test server issue )
Today:
- workspace language latest code review fix
- fix invoice prefix issues if any
- 5 package support
Blockers/ Assistance
Asif
Yesterday:
- fixed 4 prod issues
- working on editor issues
Today:
working on editor issues
Blockers/ Assistance
Ali
yesterday
On leave
Today
Chat PRD
user survey questionare
Tohid
Yesterday:
code review: couple of production fixes, workspace language
meeting with the team member regarding issues with workspace language in test server and debugged the isssue
Today:
- complete the prod fixes
- vite setup for production, test, release server
Bolckers/ Assistance
Atik
Yesterday:
workspace name special chars
subscription delete
inactive subs filter
Today:
Client custom access
Tasfi
What did I do yesterday:
Landing Page Feedbacks
Sidebar Collapsed View
Rectangle Logo
What will i do today:
Embed System Enhance with Embed inside of a feature
Redirect URL after Purchasing
Rectangle Logo Size and Resolution
Rectangle Logo in Collapsed Sidebar
Date: 06.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Rich Text editor test & bug post
Production bug fixes test, and posted 2 bugs on follow up
Intercom issues verify and post
Workspace Language Test 75%
Tested bug fixes of 100% coupon
What do I do today:
Complete testing of Workspace Language
Will Complete testing of 5 bug fixes of production.
Nafi
Yesterday:
Tested prod bug fix: Non-English Characters Are Not Displayed When Creating a Client or Lead
Posted Prod bug: Non-English Characters Incorrectly Treated as Special Characters in Workspace Name
Posted Prod bug: Unable to Edit or Update Subscription Reminder Email Template Due to Validation Error
Production issues came from users
Verified language working procedure in production
Updated PRD of Subscription
Verified 2 issues of Invoice Prefix and Posted 1 more issues of Invoice Prefix
Today:
Integration Test of Invoice Prefix
Ridwan
Yesterday:
- workspace language code review fixes
- debugging workspace language local storage support not working in test server.
- invoice issue fix
- 5 package support ( not much work could be done because of workspace language test server issue )
Today:
- workspace language latest code review fix
- fix invoice prefix issues if any
- 5 package support
Blockers/ Assistance
Asif
Yesterday:
- fixed 4 prod issues
- working on editor issues
Today:
working on editor issues
Blockers/ Assistance
Ali
yesterday
On leave
Today
Chat PRD
user survey questionare
Tohid
Yesterday:
code review: couple of production fixes, workspace language
meeting with the team member regarding issues with workspace language in test server and debugged the isssue
Today:
- complete the prod fixes
- vite setup for production, test, release server
Bolckers/ Assistance
Atik
Yesterday:
workspace name special chars
subscription delete
inactive subs filter
Today:
Client custom access
Tasfi
What did I do yesterday:
Website Design Feedback Updates
What will i do today:
Website Feedback Updates and Newly Assigned Tasks (will be assigned)
Date: 05.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Superadmin mention team member in comment
Rectangular logo support
Workspace Language Test 50%
What do I do today:
Rich Text editor test & bug post
Production bug fixes test, and posted 2 bugs on follow up
Intercom issues verify and post
Workspace Language Test 100%
Nafi
Yesterday:
Completed invoice prefix feature test and posted 3 FE bugs
Rectangular Logo
Sign up text white labeling
Street Address in invoice setting
Today:
Tested prod bug fix: Non-English Characters Are Not Displayed When Creating a Client or Lead
Posted Prod bug: Non-English Characters Incorrectly Treated as Special Characters in Workspace Name
Posted Prod bug: Unable to Edit or Update Subscription Reminder Email Template Due to Validation Error
Production issues came from users
Ridwan
Yesterday:
Working on 5 package support
Today:
workspace issue fix
adding new package UI in order form, proposal form
Blockers/ Assistance
Asif
Yesterday:
Bug Fixes (Production)
Sync data of order summary with upsell & Add On card
Production issues came from Orvi vai
Today:
Fixing PROD issues
Blockers/ Assistance
Ali
yesterday
enhancement request update
weekly deliverable report
chat PRD 2nd draft after getting review of 1st draft
PRD and changelog update
Design review- Sandbox, Embedded System
Release server test for currency- Quait Dinar
Today
On leave
Tohid
Yesterday:
Code review of couple of production fixes
Fixed issues: Rectangle logo support, Proposal Download issue
Today:
Code review of Workspace Language
Special characters on Workspace Name add, edit etc
Vite on test, release, production
Bolckers/ Assistance
Atik
Yesterday:
team mention
invoice prefix bug fix
api doc writing
prod bugfix
special character allow
Today:
Tasfi
What did I do yesterday:
Website Feedback
work on previously done design feedback if needed
New design will be assigned by PM
What will i do today:
Landing Page- 100%
Logo issue
Date: 04.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
100% coupon - 100%
Invoice Prefix - 100%
Retested 2 bugs
Posted 4 bugs of production
What do I do today:
Superadmin mention team member in comment
Rectangular logo support
Wrokspace Language Test
Nafi
Yesterday:
Invoice Prefix - 100%
API Testing R&D
Today:
Invoice Prefix bug fix retest
Production issues came from users
Ridwan
Yesterday:
90% of 5 package support
Today:
Working on 5 package support
Bolckers/ Assistance
Asif
Yesterday:
Bug Fixes (Production)
Today:
Sync data of order summary with upsell & Add On card
Production issues came from Orvi vai
Bolckers/ Assistance
Ali
yesterday
coupon prd recheck
per workspace/per company feature update finalization and task creation
release note publish
Road Map Update
enhancement request/integration request update
Chat PRD finalize
embedded design review
sandbox design review
Today
enhancement request update
weekly deliverable report
chat PRD 2nd draft after getting review of 1st draft
PRD and changelog update
Design review- Sandbox, Embedded System
Release server test for currency- Quait Dinar
Tohid
Yesterday:
Workspace Language code review
fixed issues: rectangle logo support
Today:
reviewed the ffv2 extension failure and trying to give a fix with installation ui and ux
fixing ffv2 extension failure and ship it to the testing stage
handling production issues
Bolckers/ Assistance
Atik
Yesterday:
Paypal, 100% coupon, Subscription R&D
Invoice Prefix bug fix
Today:
Superadmin mention team member in comment
Package update per workspace/ per company
API DOC
Tasfi
What did I do yesterday:
Embedded Feedback
Sidebar
Sandbox Feedback
What will i do today:
Website Feedback
work on previously done design feedback if needed
New design will be assigned by PM
Date: 03.03.2025
Location: Office
Opening
Rabab
What did I do yesterday:
100% Coupon Test - 30%
Retested Invoice Prefix - 60%
Retested 4 bugs given by FE
What do I do today:
100% coupon - 100%
Invoice Prefix - 100%
Retested 2 bugs
Posted 4 bugs of production
Nafi
Yesterday:
Verify Production bugs came from users
Invoice Prefix Feature Test
Today:
Invoice Prefix - 100%
API Testing R&D
Ridwan
Yesterday:
finishing adding 5 package support
Today:
90% of 5 package support
Bolckers/ Assistance
Asif
Yesterday:
Bug Fixes (Production)
Today:
Bug Fixes (Production)
Bolckers/ Assistance
Ali
yesterday
Existing PRD review (Packages)
PRD restructuring R&D
Today
coupon prd recheck
perworkspace/per company feature update finalization and task creation
release note publish
Road Map Update
enhancement request/integration request update
Chat PRD finalize
embedded design review
sandbox design review
Tohid
Yesterday:
On Leave
Today:
File Feedback extension fail fix
continue workign on ffv2 device mode implementation and konva ui shifting issue
Bolckers/ Assistance
Atik
Yesterday:
100% coupon One Time
Paypal
Today:
Paypal, 100% coupon, Subscription R&D
Tasfi
What did I do yesterday:
Sandbox
Embedded Support
What will i do today:
Embedded Feedback
Sidebar
Sandbox Feedback
Date: 28.2.2025
Location: Office
Opening
Rabab
What did I do yesterday:
Invoice Prefix Feature Test
Appsumo Bugs Verify
Public Form FE bug fixes
What do I do today:
100% Coupon Test
Production bug fixes
Nafi
Yesterday:
Automation Discussion with Maliha Apu
Invoice Prefix Feature Test
Backend bug fix(email)
Any kind of production bugs
Today:
Verify Production bugs came from users
Invoice Prefix Feature Testdocumentation
Maliha
Yesterday: Automation Documentation and automation brief to QA
Today:
Ridwan
Yesterday:
finishing adding 5 package support
Today:
Bolckers/ Assistance
Asif
Yesterday:
working on client group rules
Today:
Bolckers/ Assistance
Ali
yesterday
5 package design update review
sandbox design review
embedded support handover to design
AB testing email list update
User Guide Review
Appsumo & Intercom communication check for user feedback